1. Site PreparationOur crew begins by marking the ground for placement of the HydroGo™ pipe. Grass is carefully removed and saved prior to digging the trench. |
![]() |
2. Creating and Grading the TrenchThe trench is dug and cleaned to accommodate HyrdroGo™ pipe. Next, the trench is carefully graded and leveled to ensure proper water flow. Often, surveying equipment is used to determine the proper height, slope and fall of the trench. |
![]() |
3. Pipe Assembly and Trench InsertionOur patentpending HydroGo™ pipe with flushable technology is placed in the trenches. |
![]() |
4. Basins and GuttersSpecial 12” x 12” Low Profile Basins are installed at appropriate intervals along the system. It is important to tie gutter downspouts (if available) into the HydroGo™ System. |
![]() |
5. The Finishing TouchesTrenches are refilled with dirt. Dirt in the trenches is tamped down for soil compaction. Each catch basin is graded for proper water flow into the system. The area is thoroughly cleaned. |
Olshan Foundation Solutions’ available WorryFree™ Maintenance Program provides the most comprehensive service approach in the industry.
The HydroGo™ WorryFree™ Maintenance Program gives you up to ten years of protection to ensure your system is operating at its peak. Learn More.