Work Site Preparation
We will relocate any plants from the work area. We then create access holes. Heavy plywood covers are placed over each hole for added safety.
Driving the Pilings
The Cable Lock™ ST Plus starter segments are pressed into the ground at each pre-determined location and subsequent inter-locking steel segments are threaded onto the cable and driven to the required depth and pressure. The number of steel segments varies based on soil conditions. In difficult soil conditions the steel sections can be “washed” into the ground using high pressure water to help gain greater depth or confirm end bearing.
Then a hybrid transition piece is placed atop the last steel segment and the first concrete cylinder is placed on top of the transition piece. The concrete segments are added onto the cable and driven into the ground to the point of refusal. A pile cap is then positioned on top of the last concrete cylinder and the entire system is locked together with the Cable.
The Final Stage
Trained personnel direct the repair process while carefully monitoring the reactions of the structure. Upon completion, spacers are inserted on concrete blocks to support the building. The top portion of the holes are then refilled with soil and any surface concrete breakthroughs are patched. Plants are replanted and the work areas, walks and driveway are cleaned.