1. Site PreparationWe will relocate any plants from the work area. We then create access holes. Heavy plywood covers are placed over each hole for added safety. |
|
2. Driving the PilingsThe Spiral Lock Starter Segments are pressed into the ground at each predetermined location and subsequent Cable Lock™ Spiral Cylinders (with cable through the center of each) are driven to the point of refusal. A pile head is then positioned on top of the last pile segment and the cable is LOCKED into place using our exclusive Sure Lock™ technology. Concrete blocks are then placed on top of the piling cap directly under the bottom of the foundation. |
|
3. Final StageTrained personnel direct the repair process while carefully monitoring the reactions of the structure. Upon completion, spacers are inserted on concrete blocks to support the building. The top portion of the holes are then refilled with soil and any surface concrete breakthroughs are replaced. Plants are replanted and the work areas, walks and driveway are cleaned. |
EVERY Cable Lock™ Plus System installation is backed by a Lifetime Transferable Warranty. One without pages of fine print, exclusions, exceptions, confusing legal jargon and what-ifs. Learn More.