The Water Lock™ Plus Installation Process

As always, our waterproofing work is performed by an expertly trained and experienced crew. It is quick, clean and safe. Completed on time. And done right. That’s how we make it easy on your home. And you.

 

Excavation
First, we break through the concrete in the repair areas and remove any debris. The breakout is no wider than 6”–8” in most cases. We then dig down to the footer.

Drilling
Next, we’ll drill weep holes in block walls as needed. This allows water that enters the voids in the bricks to drain into the Water Lock™ Plus System.

Protecting
The optional Water Shield™ provides another layer of protection and adds a finishing touch to your basement.

Installing the Water Lock™ Plus Pipe
Next, we install the dual chamber Water Lock™ Plus pipe. The high flow core ensures long-term performance.

Installing the Pump or Gravity Drain
Your Water Lock™ Plus technician will then install the pump. The pump lid fits flush with the floor. We also recommend a battery backup system.

Replace Concrete
Upon completion of installing the Water Lock™ Plus pipe, the concrete is replaced. Then, we’ll tidy up.

The entire process only takes one or two days in most cases. But lasts a lifetime.