- Permanent solution when properly installed
- Bell bottom footing can be checked
- Depth can be verified
- Soils can be checked visually
- Alignment can be visually verified
- Concrete is steel reinforced
|
 |
- Most pier failures occur because bell footings are not properly installed (size, debris, or moisture can affect performance)
- Soils are not properly identified
- Takes 2-4 weeks to complete the job
- Mess of pouring concrete plus time delays can cause expensive loss or damage to plants
- One size fits all regardless of weight of structure or soils
|
|