877-4-Olshan Schedule an Appointment

Olshan Foundation

WATCH THE COMMERCIAL

Watch The Commercial

This text will be replaced
CONNECT WITH OLSHAN

Wall Lock: Wall Anchoring Technology

The Wall Lock™ System Installation Process

At Olshan, we know that making things easy on you and your home is very important. Your Wall Lock™ System will be installed by a professional crew. We’ll complete the work on time and do it right.





Marking the Installation Area
Olshan crews will mark the areas where the Wall Lock™ System will be installed. A small hole approximately 5” in diameter is created in the wall.

Driving of the System
The Wall Lock™ System is pneumatically pushed through the hole to the point of refusal at an approximate 12° angle.

Wall Lock™ System is Activated
The System is activated in firmer soils and pull tested. The access hole is filled in and a steel plate or “C” channel is installed on the wall to secure the anchor.

The Wall is Stabilized
Once the Wall Lock™ System is installed, the pressure readings are recorded and the deflection of the stabilized wall is noted.

Cleanup
All materials are removed and the Olshan crew performs a final cleanup. Leaving your home neat and clean.

The entire process only takes one or two days in most cases. But lasts a lifetime.



 

Search Our Website

Sign Up For Our Newsletter!

Subscribe to our Olshan HomeTips newsletter. About every four weeks, you will get tips from the Olshan professionals about how to maintain  your foundation and your home.

Schedule a
free estimate









Bold fields are required.